MANILA: The Department of Public Works and Highways (DPWH) announced the partial closure of Mel Lopez Boulevard or Radial Road 10 (R10) for various construction works starting Wednesday.In an advisory, the DPWH North Manila District Engineering Office said the drainage construction would be conducted along the sidewalk of the road's southbound lane near Pacheco Street in Manila and would take more than two months.On the other hand, it added that reblocking works along the road would start at 11 p.m. on Friday.The reblocking works will be conducted along the southbound lane with a total length of 403.40 linear meters from the Philippine Ports Authority's Pacheco Gate to Moriones Gate and the northbound lane with a total length of 261.90 linear meters between Zaragosa Street and Pacheco Street.The DPWH warned motorists of traffic slowdowns in the affected areas and advised them to use alternative routes.'Rest assured that the lanes will be opened immediately after the construction activities, estimate d to be completed by Oct. 31, 2024,' it said.The project is part of the DPWH-National Capital Region's commitment to improving road safety and efficiency in Metro Manila.Source: Philippines News Agency
post
Mel Lopez Blvd. partially closed for 2-month drainage, repair works
Recent Posts
LSB and UNFPA Collaborate on Thematic Reports for 2025 Census
November 6, 2026
KPL Advocates for Ethical AI Use in Journalism at Seoul Forum
November 6, 2026