The Vietnam - Russia oil and gas joint venture Vietsovpetro said on September 11 that it completed the installation of the wellhead platform topside block of the BK-23 drilling rig at Lot 09.1 of Bach Ho oil field, 145 kilometres to the southeast of Vung Tau city a day earlier. More than 130 workers used a crane vessel to install the 760-tonne block in accordance with schedule, ensuring safety and the most rational costs despite bad weather conditions caused by typhoon Yagi.Source: Vietnam News Agency
post
Vietsovpetro successfully installs wellhead platform topside at Bach Ho oil field
Vietsovpetro successfully installs wellhead platform topside at Bach Ho oil field
Recent Posts
LSB and UNFPA Collaborate on Thematic Reports for 2025 Census
November 6, 2026
KPL Advocates for Ethical AI Use in Journalism at Seoul Forum
November 6, 2026