post

Toll Collection Set to Commence on National Highway No. 9

Toll Collection Set to Commence on National Highway No. 9

Vientiane:Toll collection on National Highway No. 9 is scheduled to begin on November 16, as announced by the Ministry of Public Works and Transport. Tolls will be collected manually at designated checkpoints by permanent staff, with rates approved by the ministry.

According to Lao News Agency, the toll rate will be set at 35% of the rate charged on the Vientiane-Vang Vieng Expressway. This initiative is part of a model project under new government policies aimed at promoting road construction and maintenance, in line with National Assembly Resolution No. 165/NA and Government Resolution No. 10/LP.

Minister Leklay highlighted that Laos has developed an extensive road network since national liberation, encompassing a total of 60,372 kilometres, including 8,094 kilometres of national highways. However, many roads have deteriorated due to insufficient maintenance funding, management challenges, natural disasters, and an increasing number of vehicles. Non-compliance with traffic regulations has further contributed to road damage and safety concerns.

The minister stated that toll revenue would be directed towards regular maintenance, repairs, and road upgrades, with the ministry overseeing the collection process to ensure transparency and regulatory compliance. He urged residents, transport operators, and other road users to pay the required tolls and adhere to instructions from toll booth staff to facilitate smooth and orderly traffic.

Furthermore, the ministry is preparing measures to tackle the issue of overloaded trucks, drafting legislation based on existing laws and Prime Minister's Order No. 47/PM, with nationwide implementation anticipated in December 2026. These measures aim to prevent overloaded trucks from operating on Lao roads and to protect road infrastructure.